Skip to content
Geodot
Planned route

Logistics platform · WMS, TMS, routing and load planning

Warehouse, load and route
planned from the same data

When the warehouse, load building and routing are decided in separate systems, trucks leave with spare room and errors surface at the dock. Geodot plans them together on top of your ERP, with a team that implements alongside yours.

What the system doesn't record you pay for at the dock and on the road

  • Trucks leave with a load margin because nobody knows whether the load will fit.
  • Routes are built by hand and depend on one planner's experience.
  • Shelf-life rejections surface once the order has already reached the customer.
  • The ERP, the warehouse and transport record the same order with different data.
Trucks with unused spaceExtra trips
Routes built by handDepends on one person
Trips without trackingExceptions found late
Disconnected systemsManual reconciliation

Routing and palletizing in one calculation

Every time you move a customer from one truck to another, the pallet plan is recalculated on the spot and tells you whether it fits. That removes the load margin trucks used to leave empty, just in case.

Trip pallet plan

Trip 0417 · 26-position semi-trailer

Pallet 07 · build order

1.20 × 1.00 m pallet · 2 delivery stops

  1. 1.The heaviest cartons at the baseFour large cartons for stop 2 make a flat floor.
  2. 2.Heavy cartons on the axis, on a firm baseThe second layer is turned to interlock the base joints.
  3. 3.Medium boxes and packs by stopMedium cartons for stop 2 on one side. The packs for stop 1 on the side unloaded first.
  4. 4.Fragile on topSmall cartons and the fragile carton last, with nothing heavy above.
  5. 5.Stretch film and height checkWrapped, then checked against the 1.60 m limit.
  • Heavy freight
  • Medium and light freight
  • Film-wrapped pack
  • Fragile
  • Current step

Build result

Usable volume filled
81%
Total weight
340 kg
Height above the pallet
1.30 m
Centre of gravity
0.44 m high · 1 cm off axis

Routing without palletizing

Loaded with a load margin

85%

Routing and palletizing together

Loaded with what fits, calculated

99%

  • Trip load
  • Added customer
  • Empty margin
Fits

You moved 1 customer from R‑07 to R‑12 · Pallet plan recalculated: it fits

Interface illustrationSample data
  1. 01Know what fits before loadingThe router checks with the palletizer on every change. The truck turns green if the load fits and red if it does not.
  2. 02Build rules in the engineHeavy, sturdy freight goes at the bottom, fragile freight on top, and nothing heavy above it. Each pallet is built in unloading order and stays under the height limit.
  3. 03Load margin as a ruleThe margin the operation requires is part of the calculation and holds on every truck.

Warehouse, load, route, documents and bonded storage in one system

The modules share the same order, inventory and fleet data. A Geodot team puts them to work with yours.

A hooded operator, seen from behind, holds a scanner showing a check mark while a forklift loads a trailer.
  • Receiving on the origin label

    Zero Label reads the barcode each package already carries, so nothing is relabeled at the dock. Every move is logged from arrival.

    See Zero Label
  • A layer on top of your ERP

    SAP Business One, SAP S/4HANA, SAP TM/EWM, Oracle, Oracle OTM and BASIS Release 53, the latter in production. Your ERP stays the system of record.

    See integrations
  • A team that implements with yours

    We work inside your operation with an owner on each side. The pilot is measured against success criteria both parties sign before it starts.

    About Geodot

A bottler's fleet in Argentina, with load and route planned together

Routing and palletizing are now computed together, connected to the ERP the company already had.

Bottler in Argentina, before and after Geodot
AreaBeforeWith Geodot
Fleet vs. volume100 contracted trucks for volume that called for 150The same contracted fleet, no trucks added
Departures50 trucks went out on a second runEach trip leaves with its load computed before loading
Returnable glassSpace reserved by eye on every truckA rule that added 10% capacity and 4 to 5 fewer trucks per day
Transport costEmpty margin paid for on every trip−8%

What each team needs to review

  • Operations

    What changes at the dock, in the warehouse and on the route, and how it is measured.

  • Technology

    How it integrates with your ERP, where it is deployed and how much work it asks of your team.

  • Finance

    What the pilot measures before you commit to the project, and how much free capacity your fleet has.

  • Security and compliance

    Where your data lives, who has access and what is recorded for every movement.

Information for your committee

Our team emails you the technical and commercial information your committee needs: integration, deployment, security and licensing model.

* Required fields

First operation in production in about 90 days

It starts with a pilot that measures what was agreed before you commit to the project. The plan then moves in phases to the first operation.

See how implementation works
pilot, with signed success criteria
1 week
plan, in four phases
13 weeks

Let's review one day of your orders and calculate how much capacity you have left

In the meeting we show you the platform on an operation like yours and agree on what a pilot would measure.